26.1.17
On-site: Zach kKeys, mMaeve kKeys and Stephen Keys ; start time 7:30 AM. w
We started to dig down for the shaft weand built two rings, wrapped with polish. Damon and plastic type the steel and poured 23 m of concrete.
The text above was approved for publishing by the original author.
Previous
     
Next
Just go to your Inbox, press on the confirmation link we have sent you, and you will get the corrected text back. If you want to correct more emails you can simply:
Or